Cyril is right 13:38 Nov 28, 2022
While 'synthèse' can indeed be 'summary' in many contexts, here it refers to 'études de synthèse', abbreviated SYN in the looong list of types of studies related to construction projects (EP, ESQ, AVP, APO, APS, APD, VISA, EXE, PRO, DCE, etc.), and a large part of these overview/design coordination studies is indeed clash detection, something the Almighty could have done with: as someone once said, He must be an Engineer. After all, who else would run a sewer through the middle of a recreational zone? |